home
contact
250
250s
500
build

BUILD

The contractors are some of the most accomplished in the world, and the build costs are around a third of a European-built hotel.

The units are constructed out of steel and undergo rigorous testing to meet both ISO and Lloyd’s Register requirements for shipping.Each unit is self-contained for heating and cooling and so once lifted into place, they simply plug into services.  Access stairs and walkways are stylish and quiet and can either be left open or enclosed beneath an air-filled translucent envelope.  The interior is immensely cool, but completely durable and easy to maintain.The exterior can be clad in a number of finishes – from stainless steel through to a digitally printed film designed to suit individual branding requirements - therefore, completely losing any reference to it’s transportation. 

Internally, we’ve specified high quality fittings and finishes, but they’re designed to be long-life and robust and should last a very long time.

 

m-hotel
news
move
home | 250 | 250s | 500 | build | move | projects | news | contact
www.timpyne.com